cover
Contact Name
Aswir Premadi
Contact Email
aswir.premadi@itp.ac.id
Phone
-
Journal Mail Official
aswir.premadi@itp.ac.id
Editorial Address
-
Location
Kota padang,
Sumatera barat
INDONESIA
Jurnal Teknik Elektro
ISSN : 22523472     EISSN : 25988255     DOI : -
Redaksi Jurnal Teknik Elektro Institut Teknologi Padang mengundang para Peneliti, Akademisi, Praktisi dan Profesional untuk menyumbangkan karya tulisnya, di bidang Teknik Elektro, baik berupa hasil penelitian dan kajian pustaka yang belum pernah dipublikasikan sebelumnya di media lain.
Arjuna Subject : -
Articles 1 Documents
Search results for , issue " Vol 5, No 1 (2016): Jurnal Teknik Elektro ITP, Volume 5, No. 1" : 1 Documents clear
STUDI KELAYAKAN PERALATAN PADA INSTALASI PANEL KONTROL DI BENGKEL TEKNIK LISTRIK, POLITEKNIK NEGERI PADANG Desmiwarman, Desmiwarman; Yandri, Valdi Rizki
Jurnal Teknik Elektro ITP ISSN 2252-3472 Vol 5, No 1 (2016): Jurnal Teknik Elektro ITP, Volume 5, No. 1
Publisher : Jurnal Teknik Elektro ITP ISSN 2252-3472

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (193.335 KB)

Abstract

Panel circuit is an equipment which can receive electrical energy and subsequently distribute and control the distribution of electrical energy through the circuit main panel and branch into panel circuit branches or directly via the circuit end to the load in the form some point the lights and through the box- contact to equipment utilization of electricity inside the building. Planning methods to repair Panel circuit is composed of several stages, namely (1) Calculate the power used on each wall of the practice, (2) Selection of rating safety MCB and CRC cable, (3) The design of the power circuit and the control circuit for the panel, (4) Sort the numbering of the cable to the output sockets on each wall of the practice (5) Preparationof a series on the panel (6) Testing.Panel circuit in electrical repair shop is designed based on the layout of the walls of the practice. Keluran of the panel for this circuit is 24 Sockets 3 phase on each wall of the practice, which is used to load a practice wall, namely the installation of lighting and power installation.

Page 1 of 1 | Total Record : 1