Inscientech: Journal of Industrial, Science and Technology is a peer-reviewed open access journal , covering all aspects of industrial engineering. Inscientech: Journal of Industrial, Science and Technology published by Universitas KH. A. Wahab Hasbullah. Therefore the journal is both free to read and free to publish in. published twice in a year, May and October.
Articles
12
Articles
‚Äč
STUDY OF FACTORS CAUSING DELAY OF COMPLETION OF CONSTRUCTION WORK BUILDING IN AIRLANGGA UNIVERSITY SURABAYA

Bhanthara, Rangga, Mudjanarko, Sri Wiwoho, Moetriono, Hary

Inscientech: Journal of Industrial, Science and Technology Vol 1 No 1 (2017): Inscientech: Journal of Industrial, Science and Technology
Publisher : Universitas KH. A. Wahab Hasbullah

Show Abstract | Original Source | Check in Google Scholar |

Abstract

Abstract: Delay in a construction project is a situation where a project cannot be carried out or completed on time in accordance with the planned time. This study aims to (1) knowing the factors that are causing delays in the building project at the Airlangga University in Surabaya; and (2) knowing the rank factors that are causing delays in the work on the building project at the Airlangga University. Data collected by the questionnaire survey and interview which were distributed to the respondents that experienced individuals as the executor of the project of construction of the building at Airlangga University in Surabaya or the case study projects and has held positions as leaders of the activities, the project manager or field manager, consultant supervisor or consultant construction management. Data were analyzed using methods of factor analysis and multiple linear regression analysis with SPSS for data processing. After doing regression analysis with stepwise method obtained equation Y = -3.973 + 0.489 + 0.240 X8 X7 X5 + 0.428 + 0.314 + 0.200 X1 X2 X3 + 0.185 + 0.164 + 0.102 X4 X6, it is known that (1) the labour factor (X1), design (X2), the method of implementation (X3), a substance / material (X4), finance (X5), equipment (X6), work environment (X7), and managerial (X8) affect the delay of construction work on the building Airlangga University Surabaya. (2) after multiple linear regression analysis obtained rank the(rank) the factors most dominant influence on the delay time of execution, respectively, are the factors of managerial (X8), work environment (X7), design (X2), finance (X5), labor (X1), a substance / material (X4), the method of implementation (X3), and equipment (X6). Keywords: delay factor, ranking, the method of factor analysis, multiple linear regression

Implementation of Business Process Re-engineering Concept For Improving Profit

Malika, Ika, Wahyani, Widhy

Inscientech: Journal of Industrial, Science and Technology Vol 1 No 1 (2017): Inscientech: Journal of Industrial, Science and Technology
Publisher : Universitas KH. A. Wahab Hasbullah

Show Abstract | Original Source | Check in Google Scholar |

Abstract

National sugar production in the new millennium only reached 2.3 million tons per year, while the national sugar consumption reached 4.5 million tons per year. For that reason, so the government should encourage sugar mills to diversify the products immediately. In producing sugar also generates solid waste such as blothong (: Javanesse). This study discusses the implementation of the concept of Business Process Re-engineering (BPR). BPR concept is used to design the sugar mill Business management in order to optimize it‚??s resources, so it is marketable. Under researcher observation, Lestari sugar mill, do not optimize in using of waste as a second output of sugar production yet. Solid waste utilization as briquette also helps the government in developing new renewable energy that can be optimized. As known Lestari sugar mill has not been used solid waste optimally and this research recommend for designing new business management, which reprocess blothong waste to be used as briquettes in order to increase profit. An outcome from the business management can increase profit as much as Rp 135.615.420.000,00 with the amount of total production cost as much as Rp 95.130.356.000,00 and having profit / gross loss from the Business as much as Rp 40.485.064.000,00. The proposal of the design of the business management gained more profit as pointed Rp 156.797. 670.000,00 which is included briquettes Solid waste revenue. So, the total amount of new business management cost is Rp 95.718.455.000,00 and gaining profit/gross loss as much as Rp 61.079.115.000,00. That achievement was increase as much as 22% from the previous business management. Keywords: Business Process Re-engineering, sugar mill, renewable energy, innovation, production, briquettes, solid waste (blothong), profit.

PRODUCTION SCHEDULING APPROACH BY ARENA SIMULATION AT PT. TRITUNGGAL PUTRA PERKASA

Susiati, Devi, Apriliana S.W, Indah

Inscientech: Journal of Industrial, Science and Technology Vol 1 No 1 (2017): Inscientech: Journal of Industrial, Science and Technology
Publisher : Universitas KH. A. Wahab Hasbullah

Show Abstract | Original Source | Check in Google Scholar |

Abstract

This research was conducted at PT. Tritunggal Putra Perkasa, which manufactures a wide range of shoes. Subject matter in this research is applying the method of approach to the simulation of production scheduling in the Arena. This is done because the company often experience delays in order so that the fulfillment of consumer needs cannot be met. Process in the manufacture of shoes includes a process of cutting, printing, sewing, assembling and packaging. Before using ARENA simulation, this research compares the first production scheduling between conventional by using a method of the CPM (Critical Path Method), then use the simulation Arena. Scheduling production of the company in March with the arrival of as much as five orders. This company spent 36 days with 3 days delay experience with sequencing work of A-B-C-D-E, delays occurred in the work of c. results from the application of the CPM method i.e. spent 36 days but not delay occurs with sorting jobs A-B-C-DE. After that is done the application of simulated scheduling in the production Arena, so take only 34 days with sorting jobs A-B-C-D-E. So the company will not experience the delay and gain the trust of the buyer.  Keywords: Conventional, CPM, Simulation, Arena

DISASTER MITIGATION IN FLATS : EVALUATION AND DESIGN OF A DISASTER PREPAREDNESS

Mudjanarko, Sri Wiwoho, Setiawa, M. Ikhsan

Inscientech: Journal of Industrial, Science and Technology Vol 1 No 1 (2017): Inscientech: Journal of Industrial, Science and Technology
Publisher : Universitas KH. A. Wahab Hasbullah

Show Abstract | Original Source | Check in Google Scholar |

Abstract

Law Number 24 year 2007 on disaster management, mitigation is defined as a series of efforts to reduce disaster risk, either through physical development as well as awareness raising and capacity building facing the threat of disaster. Design of zoning into account key parameters, namely the earthquake zoning based seismic design category. Earthquake Disaster Mitigation in the flats, before disaster: (1) Categorization of areas based on the characteristics of the earthquake zone (seismic zoning); (2) Research the characteristics of land on which will be built flats (flat), whether included soft soil or hard soil; (3) Making a clear evacuation path on the building of towers and the surrounding area; (4) The construction of towers based on building standards for residential/earthquake resistant buildings, ranging from foundation to finish by referring to the building codes in force, such as size of the building (the building that avoid angular or curve) and the configuration of the building; (5) Quality control of the implementation of the building starts from the initial stage to the final stage; (6) The use of special material for reinforcement (retrofitting material), from local materials that are easy to find while saving the cost. While disaster, following guidelines/procedures for emergency earthquake that have been enacted or have been given training by the manager of the flat to flat consumer. After the disaster happen : (1) Checking of the condition of the flat dwellers who experience the disasters; (2) Checking of the condition of the buildings are damaged, the type of damage (structural and non-structural), and measures anticipated; (3) Improved method to save themselves; (4) Rehabilitation timely and build back better; (5) Maintenance and check on the condition of the building towers at regular interval. Keywords: Mitigation, Flats, Quality Control

The Analysis of Potential Workplace Accidents Using Hazard Identification and Risk Assessment Method

-, Sarifaturrohmah, Wahyani, Widhy

Inscientech: Journal of Industrial, Science and Technology Vol 1 No 1 (2017): Inscientech: Journal of Industrial, Science and Technology
Publisher : Universitas KH. A. Wahab Hasbullah

Show Abstract | Original Source | Check in Google Scholar |

Abstract

Abstract. Nowadays, in this globalization era, most of the companies develop machinery and tools supported by a sophisticated technology. They do believe that by using the technology, hope the process of production becomes faster than using pure man power. Moreover, the company can produce a huge number of products. However, on the other hands, sometimes an operator who works on a particular subject to an improper machine has skill. Therefore, it is able to cause the work accident which is in the several cases can be fatal. There was a company which has a textile business. It produced strings as an essential material for draperies and carpets. During the operators operate and the production machinery, an unexpected accident occurred. Often if it did not use the right or standard procedure. Refers to that background, the researcher does the analysis of the potential of workplace accidents in the spinning department by using the Hazard Identification and Risk Assessment Method. The results of the research that has conducted in that department was a potential of hazards commonly occur in that workplace are as follows: the workers fingers have pinched by the machine, the workers fingers have run over by the machine, unconscious, being injured in hands, and have the material downfall. As for, the hazard that has inflicted be included into the high level of risk, the which is: the workers fingers have pinched by the machine, the workers fingers have run over by the machine, unconscious, and being injured in hands. Furthermore the medium level of risk the which is: have the material downfall and lower level of risk which is: have a shock and legs injured. In addition, refers to the results of the research, the researcher could recommended several inputs to the company, exactly to the worker, the which is : keep fit, wearing a mask during do the job, arranging a space (safe distance) between the worker and the machine, wearing safety tools (safety gloves and shoes included), checking the condition before do the job, making sure that the fiber in the balanced position. Keywords: Hazard, Hazard Identification, Risk, Risk Assessment, Workplace Accidents, Potential Workplace Accidents.

THE ALTERNATIVE ELECTION OF ENHANCING THE EFFICIENCY OF BATIK PRODUCTION WRITING PRING SEDAPUR

Apriliana, Indah, Wahyudi, Agung

Inscientech: Journal of Industrial, Science and Technology Vol 1 No 1 (2017): Inscientech: Journal of Industrial, Science and Technology
Publisher : Universitas KH. A. Wahab Hasbullah

Show Abstract | Original Source | Check in Google Scholar |

Abstract

The excessive use of resources leads to increase the production costs and wasted materials. It also resulted in a decrease in the level of the company‚??s production efficiency. However, it is not easy to identify the problem of waste. Small batik industry in Magetan city which is famous for Batik Tulis Pring Sedapur pattern is also one of the businesses which are until now still looking for the inefficiency of the production process so that the daily output is less than optimal. Therefore, the interviews are conducted repeatedly to the expert to identify the cause‚??s problem of the daily output unpredictability. The result of these interviews will be an input to be used for data processing of AHP model. The criteria for the decision-making to choose the alternatives include time, cost, and output. While the proposed alternative is the addition of the labour pattern and the manufacture of the clothesline. The result of qualitative and quantitative data processing and consistency test show that the procurement of the clothesline can increase the efficiency of space and daily output. Keywords: Problem identification, efficiency, Delphi Method, AHP, Alternative choosing.

Implementation of Method and Partnership Managerial Operation System in Environmentally Friendly Rice Cultivation

Sukarsono`, Agustin, Daroini, Ahsin, Wahyu HD, Bambang

Inscientech: Journal of Industrial, Science and Technology Vol 1 No 02 (2017): Inscientech: Journal of Industrial, Science and Technology
Publisher : Universitas KH. A. Wahab Hasbullah

Show Abstract | Original Source | Check in Google Scholar |

Abstract

The need for a progressive organization is based on the quality and integrity of the human resource as one of its fundamental elements. So that an organization must have a management function within the organization, while the management functions of the four is planning (planning), organizing (organizing), actuating (briefing), controlling (supervision). It is intended that an organization can be run in accordance with the objectives to be achieved by an organization. In this study, the source of the data used is organic rice farming model with planting patterns healthy and mandate (PTSA), which has been applied by the working group (gapoktan) LM3 POMOSDA. While the method of problem-solving by using effective methods of problem-solving to find simultaneously solve the problems of guidance and assistance to farmer group in POMOSDA ( Pondok Modern Sumber Daya At-Taqwa). The expected outcome of this research is to determine consumer loyalty and the partners of farmers while recognizing the success of organizational development at the farm agribusiness independent organization rooted in society Pondok Modern Sumber Daya At-Taqwa (LM3 POMOSDA) Nganjuk Regency  

Analysis of Commuter Route Passenger Train Station Moda -Station Lamongan Station, Turi Market Surabaya

Alfi, Numan, Mudjanarko, Sri Wiwoho

Inscientech: Journal of Industrial, Science and Technology Vol 1 No 02 (2017): Inscientech: Journal of Industrial, Science and Technology
Publisher : Universitas KH. A. Wahab Hasbullah

Show Abstract | Original Source | Check in Google Scholar |

Abstract

Surabaya is a very influential on the increase in freight transportation needs of the surrounding city. Lamongan and Gresik city, which is access to Surabaya from western requiring rail transport. The city stands in many industrial plants that have large numbers of workers to transport large capacity that is expected to reduce the congestion of the city using Commuter Rail transport modes. Problem magnitude transport capacity makes researchers need to conduct research to analyze the commuter railway passengers who were in St. Lamongan. Method of research done in the form of a commuter passenger survey for analysis and calculation. The results of this study clearly visible that the respondent data penmpang 100 commuter trains, 75% of whom are of childbearing age, traveling on official business purpose. and the results of the CSI shows 44.78% of consumers rated less satisfied with the performance and service.  

Crossing Feasibility Study Between Sea Freight Vehicles Port-Port of Sheet Anchor Situbondo lombok.we

Sudarso, Soni, Mudjanarko, Sri Wiwoho, Moetriono, Hary, Oetomo, Wateno

Inscientech: Journal of Industrial, Science and Technology Vol 1 No 02 (2017): Inscientech: Journal of Industrial, Science and Technology
Publisher : Universitas KH. A. Wahab Hasbullah

Show Abstract | Original Source | Check in Google Scholar |

Abstract

Sea Crossing feasibility Study for goods transport Vehicles of All Sheet Anchor, intends to assess the feasibility of the economic aspects, in order to be an attraction for employers to transport equipment whether or not to divert the route. Anchors Port Development crossing so be crossing ferry port with direct destination Lombok West Nusa Tenggara. And the continuous movement of interest NTB-NTT through the island of Bali, which is an icon of Indonesian tourism is no longer burdened with freight vehicles. So relevant to the national program by the Indonesian government Toll Marine present.               By calculating the operating costs of freight vehicles will be known to the costs actually incurred by the transport of goods between Asembagus effort Situbondo - Sheet Harbor NTB through these crossings Ketapang - Gilimanuk, Bali continued crossing padangbai - Sheet Harbor Rp. 5,380,338, -. While crossing rates crossings between Surabaya - Lombok through the port of Tanjung Perak port towards sheets of Rp 4.574 million, - for class freight vehicles of the same.               So if held crossings of freight from the Port Anchors in Situbondo Asembagus toward Sheet Harbor lombok.we or otherwise will be much more economically feasible to be realized. This study could be the basis of information from public policy to support the national development program.   Keywords: Feasibility Study, Route Freight Vehicles Land-Sea, Vehicle Operating Costs  

Yeast On Epiphyte of Tangerines Citrus Fruit (Citrus nobilis L.) and Their Potential Antagonist to Colletotrichum Gloeosporioides (Penz.) Penz. & Sacc.

Pramudita, Oki, Muhibuddin, Anton

Inscientech: Journal of Industrial, Science and Technology Vol 1 No 02 (2017): Inscientech: Journal of Industrial, Science and Technology
Publisher : Universitas KH. A. Wahab Hasbullah

Show Abstract | Original Source | Check in Google Scholar |

Abstract

One of the most important diseases of citrus plant is anthracnose which caused by Colletotrichum gloeosporioides (Penz.) fungi. Yeast is one of microbes which has a good potential to control the disease. This research focused on exploring yeasts on tangerines and examining their efficacy to control C. gloeosporioides using in vitro and in vivo treatments. Observation was started by isolated C. gloeosporioides and yeast from tangerines citrus fruit, then followed with in vitro and in vitro treatment. Both were counted the percentage of antagonist and pathogen incubation stage and also disease incidence, respectively. Result showed that yeast has been isolated from tangerines fruit were Candida sp. (isolate 1), Candida sp. (isolate 2) and Pichia sp. All yeast showed inhibit C. gloeosporioides growth and suppressed its development.