JURNAL R & B
Vol 4, No 2 (2004)

Perbandingan Perhitungan Rencana Anggaran Biaya Cara Manual Dengan Menggunakan Software Winest (Studi Kasus Pada Proyek Peningkatan Politeknik Negeri Padang)

Syofyan, Elvi Roza ( Jurusan Teknik Sipil Politeknik Negeri Padang )
Munafri, Munafri ( Jurusan Teknik Sipil Politeknik Negeri Padang )



Article Info

Publish Date
16 Mar 2012

Abstract

In executing a project, required to planning budget of its, in order not to happened loss in doing a project. Budget planning is way to estimate to the number of needed to expenses like fee and materials and also other costs related to execution a project or is a plan totally from all activity that happened in project. There are many software can be used for cost estimate a project construction like : Microsoft Project, Primavera, etc. but based on experience many engineers more prefer to use WinEst that other software. This research aim to for compare of calculation budget plan way of manual by using Microsoft Exel / Lotus 123 with WinEst software, which is application at one particular work of development in civil workshop building atĀ  polytechnic State Project Improvement. Result of calculation of budget plan by manual (Exel) and use Software WinEst show that no difference meaning. The result showed that Analyzed the budget usingĀ  Winest program is faster and more accurate than manual system, because in the WinEst program there is fix formula to calculate the work volume.

Copyrights © 2004