NYOMAN DITA PAHANG PUTRA, NYOMAN
Unknown Affiliation

Published : 2 Documents
Articles

Found 2 Documents
Search

Rancang Bangun Sistem Informasi Monitoring Perkembangan Proyek Berbasis Web MUDJAHIDIN, MUDJAHIDIN; DITA PAHANG PUTRA, NYOMAN
Jurnal Teknik Industri Vol 11, No 1 (2010): Februari
Publisher : Department Industrial Engineering, University of Muhammadiyah Malang

Show Abstract | Original Source | Check in Google Scholar | Full PDF (700.872 KB)

Abstract

Bina Marga and Pematusan official (Bimatus) is government office that deals with transportation improvement and maintenance especially streets and bridges. Each of projects in Bina Marga and Pematusan official has work planning data. Those early data are used as a measure for project development. Consequently, project development information is one of the important things to know whether a project is running well. According to that need along with computer based system improvement that is used to maintenance real and planning data, official would know whether project realization is running well or not. System development is begun with needs identification, then, created system design that is explained with UML and ERD. System design is used in web circumstances, WAP-PHP based, and MySql database. Finally, examinations for many functions are done to evaluate system task. This results a web application and WAP that could manage project development data at Bina Marga and Pematusan Official.
Value Engineering dalam Pembangunan Rusunawa DITA PAHANG PUTRA, NYOMAN; MUDJAHIDIN, MUDJAHIDIN
Jurnal Teknik Industri Vol 10, No 2 (2009): Agustus
Publisher : Department Industrial Engineering, University of Muhammadiyah Malang

Show Abstract | Original Source | Check in Google Scholar | Full PDF (1324.15 KB)

Abstract

Value engineering is done to make an effort to organize systematically and applying a technique that identifies the product function that aims to meet the required function with the lowest price. Analytical Hierarchy Process method is used in the analysis phase of work plan to choices alternative that is more objective based on several variables. In the chart of the breakdown cost model, 7 items of work have the highest cost, based on the work items was found 2 items of work that have the potential to do great engineering work that is the value of the walls and ceiling. The application of the results of value engineering on the walls, recommended the bricks, concrete stiffeners, stucco 1:4, paint walls, ceramic that savings of Rp 92,578,941 or 13.6% of the total cost of initial construction. In the same way, for the ceiling work that is recommended to change the calsiboard hollow iron frame with GRC framework furing metal so that savings of Rp40, 499,036 or 17.3% and ceiling aluminum grill on the bathroom with the calsiboard furing metal frame so that savings of Rp20,226,477 or 40%. Total savings that occur: Rp7,036,167,661 — Rp6,882,863,207 = Rp153,304,454 or 1.95% of total construction cost.