Articles

Found 2 Documents
Search
Journal : IJAE ( Jurnal Ilmu Ekonomi Pertanian Indonesia )

PEMETAAN AREAL POTENSI KONFLIK IZIN USAHA PEMANFAATAN HASIL HUTAN KAYU HUTAN TANAMAN (IUPHHK-HT) BERBASIS SISTEM INFORMASI GEOGRAFIS (SIG) PADA PT. RAPP ESTATE MANDAU

IJAE ( Jurnal Ilmu Ekonomi Pertanian Indonesia ) Vol 7, No 1 (2016)
Publisher : IJAE ( Jurnal Ilmu Ekonomi Pertanian Indonesia )

Show Abstract | Original Source | Check in Google Scholar

Abstract

Information on potential areas of conflict is very important and the information required by stakeholders in the conflict control activities plantations. Presentation of spatial data will further help provide a clear and accurate information on the location, the distance between the location and accessibility of potential areas of conflict with existing security resources in the field. This study aims to map out potential areas of conflict in the Business License Utilization of Wood Forest Plants (IUPHHK-HT) PT. RAPP Estate Saber. This study was conducted in May 2014 s.d. July 2014 and the location of this research is the Business License Utilization of Wood Forest Plants (IUPHHK-HT) PT. RAPP Estate Saber located in Siak regency, Riau Province. The method used in this research is the analysis of overlay with a predefined scoring. Research shows it is known that IUPHHK-HT PT RAPP Estate Saber area which was dominated by the level of potential conflict with an area 12499.87 ha (71.59%) for class A potential, 3047.43 ha (17.45%) for the potential class, and 1913.70 ha (10.96%) for very potential class.

ANALISIS BIAYA PEMBIBITAN AKASIA (ACACIA CRASSICARPA) PADA HUTAN TANAMAN INDUSTRI (STUDI KASUS DI PT. SINAR SAN JAYA, KECAMATAN KUALA KAMPAR, KABUPATEN PELALAWAN)

IJAE ( Jurnal Ilmu Ekonomi Pertanian Indonesia ) Vol 8, No 1 (2017)
Publisher : IJAE ( Jurnal Ilmu Ekonomi Pertanian Indonesia )

Show Abstract | Original Source | Check in Google Scholar

Abstract

The objectives of this research were: (1) To find out the production cost of Acacia Crassicarpa nursery in Industrial Plantation Forest in Serapung Island; and (2) Analyzing the feasibility of breeding Acacia Crassicarpa in Industrial Plantation Forests in Serapung Island. The method used was survey method, the implementation of which is observation and interview. The tools and materials used in this study were stationery, cameras, calculators, voice recorders and Microsoft Excel software version 2016. This research was conducted at PT Sinar San Jaya company located in Serapung Island, Kuala Kampar District, Pelalawan Regency Riau. This research was conducted for 3 months from January to March 2017. In the procurement of raw materials, a fee was of IDR 651,242,000. The costs required, consisting of fixed costs and variable costs. Fixed costs consist of salaries of permanent workers, costs of fertilizers and chemicals, fuel costs, oil costs and procurement costs of nursery equipment totaling IDR 2,007,756,932, while for non-fixed costs, the salaries of non-permanent workers, the cost of fertilizers and chemicals, the cost of procuring nursery equipment with a total value of IDR 187,249,790. The total production cost is IDR 2,195,006,722. While the total income is IDR 3,965,371,640 from the production of seedlings totaling 4,088,012 stems at a price of IDR 970, - per stem, with a net profit of IDR 1,770,364,918. Break Event Point value (BEP) or break-even point (income equal to cost) is IDR 2,478,712,261, -. Whereas this business feasibility is shown by the Benefit Cost Ratio (BCR) value of 1.40, which means that this business is feasible.