Asep Saputra
Departemen Teknik Kimia, Fakultas Teknik, Universitas Indonesia, Depok 16424, Indonesia

Published : 2 Documents
Articles

Found 2 Documents
Search

FAKTOR-FAKTOR PENYEBAB DAN DAMPAK SESEORANG BERMAIN JUDI TOGEL (TOTO GELAP) (Studi di Desa Bengkulu Rejo Kecamatan Gunung Labuhan Kabupaten Way Kanan)

SOCIOLOGIE Vol 1, No 2 (2013)
Publisher : SOCIOLOGIE

Show Abstract | Original Source | Check in Google Scholar

Abstract

This study aims to determine the cause of a persons gambling lottery, how it impacts experienced post players to play gambling toggle, and how the reality of the condition of the villagers of Bengkulu rejo with lottery gambling. This study uses qualitative methods. Collecting data using in-depth interview techniques. Determination of purposive sampling of informants by selecting some community members who are directly involved in game gambling lottery and some village leaders Bengkulu rejo devices. The results showed that: firstly, the tendency of actors to play gambling toggle caused social and economic factors, as well as followed by other causal factors, namely the situational factor, the curiosity factor, factor perception of skills, and perception of victory factor; second, impact experienced actors affect the familys economic, social, and psychological offender; third, safety and comfort of Bengkulu villagers rejo be disturbed.Keywords: Impact, gambling toggle

Muara Bekasi – Muara Tawar Offshore Transmission Pipeline Routing and Economic Analysis.

Makara Journal of Technology Vol 13, No 1 (2009)
Publisher : Directorate of Research and Community Services, Universitas Indonesia

Show Abstract | Original Source | Check in Google Scholar

Abstract

Power plant Muara Tawar will substitute the need of oil fuel to gas as form of economizing and energy conservation. The nearest supply point to fulfill natural gas needed on Muara Bekasi. So that Power Plant Company needed to develop gas pipeline infrastructure to joining the point.The purpose of this study is to create a system of gas transmission pipeline from gas supply point at Muara Bekasi to Power Plant Muara Tawar trough to offshore area. Design of gas transmission pipeline is started with technical data collection and supply-demand analyzing, continued with data analysis, rute construction and result of condition operation. The standard design of this design is DnV 2000. Gas demand in Power Plant Muara Tawar is 400 MMSCFD. From secondary data had been obtained total length of alternative route 3.7 km. Carbon Steel pipe diameter which had been used 22 inch nominal diameter. Gas supply pressure is 350 psig with pressure of demand point is setted on 500 psig. On pipeline system design the preesure before put in to compressor is around 321.7 psig. The design on bottom stability factor is the main concern. From the design calculation the total minimum pipe weight is 793.16 ton, whereas the design around 932.6 ton. Therefore, the pipe will be stable on bottom of sea.