Articles

Found 8 Documents
Search

Pembuatan Wiki Legenda Indonesia dengan Menggunakan CMS Mediawiki

Jurnal Teknik ITS Vol 2, No 1 (2013)
Publisher : Lembaga Penelitian dan Pengabdian Kepada Masyarakat (LPPM), ITS

Show Abstract | Original Source | Check in Google Scholar | Full PDF (352.976 KB)

Abstract

Indonesia adalah negara yang terdiri dari berbagai suku bangsa dan budaya. Salah satu bentuk kekayaan suku bangsa di Indonesia dapat dilihat dari banyaknya legenda yang tersebar di Indonesia. Hampir setiap daerah di Indonesia memiliki cerita rakyat yang kental dengan suasana mistik, budaya dan tradisi di daerah masing-masing.Sayangnya cerita rakyat ini jarang sekali diekspos sehingga tidak jarang warga negara Indonesia tidak tahu cerita sejarah yang ada di Indonesia.  Berdasarkan pemikiran itulah, perlu diadakannya sebuah Wiki legenda Indonesia terkait mitos dan sejarah di Indonesia.Wiki legenda Indonesia menggunakan teknologi CMS MediaWiki, yang telah digunakan oleh Wikipedia sendiri. MediaWiki ini akan dipakai sebagai model awal pembuatan Wiki legenda Indonesia sehingga dapat digunakan sebagai media penyimpanan cerita rakyat. Selain sebagai media penyimpanan, Wiki legenda Indonesia juga berfungsi sebagai media diskusi para peminat cerita rakyat yang ada di Indonesia. Sehingga kedepannya, cerita legenda di Indonesia mampu diketahui oleh seluruh masyarakat Indonesia pada khususnya, dan dunia pada umumnya.

SIKLUS BISNIS PADA SISTEM INFORMASI AKUNTANSI

JUTI: Jurnal Ilmiah Teknologi Informasi Vol 3, No 2 Juli 2004
Publisher : Teknik Informatika, ITS Surabaya

Show Abstract | Original Source | Check in Google Scholar

Abstract

Dalam sebuah bisnis, segala aktivitas dan transaksi yang dilakukan akan menghasilkan data, yang nantinya data tersebut perlu disimpan dan diolah sehingga menjadi informasi yang bermanfaat bagi manajemen dalam proses pengambilan keputusan. Data yang paling penting dalam bisnis adalah data yang berkaitan dengan finansial. Untuk itu perlu kiranya dibuat Sistem Informasi Akuntansi yang berfungsi membantu organisasi untuk mengumpulan dan penyimpanan data tentang aktivitas yang dilakukan, mentrasformasi data kedalam informasi yang berguna dalam pengambilan keputusan dan perencanaan, pelaksanaan dan pengendalian aktivitas, serta mampu menjaga aset organisasi, tarutama yang berkaitan dengan data, sehingga data dapat tersedia ketika dibutuhkan, serta menjadikan data lebih akurat dan dapat dipercaya yangdigunakan untuk menyimpan. Selanjutnya pada makalah ini akan dijelaskan siklus bisnis yang ada pada Sistem Informasi Akuntansi yang terdiri dari lima siklus; Siklus Pendapatan, Siklus Pengeluaran, Siklus Produksi, Siklus Manajemen SDM /Penggajian, dan Sistem Buku Besar/Pelaporan. Uraian yang diberikan berupa konsep Sistem Informasi Akuntansi secara umum yang ditunjukkan dalam Diagram Konteks pada Diagram Arus Data yang diambil dari referensi terkait dan catatan kuliah. Diupayakan pada kesempatan lain akan dijelaskan secara detail untuk masing-masing siklus bisnis pada Sistem Informasi Akuntansi. Kata kunci: Siklus pendapatan, siklus pengeluaran, siklus produksi, siklus manajemen SDM/Penggajian dan sistem buku besar/laporan

PERENCANAAN BISNIS; ORGANISASI, LINGKUNGAN BISNIS, MANAJEMEN, DAN SUMBER DAYA MANUSIA

JUTI: Jurnal Ilmiah Teknologi Informasi Vol 4, No 2 Juli 2005
Publisher : Teknik Informatika, ITS Surabaya

Show Abstract | Original Source | Check in Google Scholar

Abstract

Suatu bisnis yang akan dilakukan, seharunya punya prespektif kedepan tentang arah perkembanggannya, sehingga diperoleh gambaran secara lebih jelas bagaimana suatu bisnis mulai didirikan sampai nantinya berkembang didalam menghasilkan suatu nilai, baik diterima secara lokal dan nasional, ataupun internasional. Tentunya prespektif ini harus terdokumantasi secara jelas berupa uraian perencanaan yang terstruktur. Untuk itu, uraian perencanaan ini dibuat kedalam suatu dokumen Perencenaan Binis (Business Plan) yang memuat tujuh hal pokok, yaitu organisasi bisnis, lingkungan bisnis, perencanaan manajemen, perencanaan sumber daya manusia, perencanaan pemasaran, perencanaan keuangan, perencanaan teknologi dan jaminan resiko. Kesemuanya diambil dari template Perencanaan Bisnis yang dibuat oleh Jeff Madura, serta ditunjang dari referensi yang lain.         Dalam makalah ini, hanya dijelaskan empat uraian yang pertama yaitu; organisasi bisnis, lingkungan bisnis, perencanaan manajemen, dan perencanaan sumber daya manusi. Dimana keempatnya akan dijabarkan kedalam sub-uraian yang terkait, dan diberikan penjelasan latar belakang dan contoh kasus.   Kata Kunci: organisasi, lingkungan bisnis, manajemen, sumber daya manusia

Analisis dan Desain Self Assessments Report Untuk Tri Dharma Perguruan Tinggi Pada Institut Teknologi Sepuluh Nopember Surabaya

Jurnal Teknik ITS Vol 3, No 2 (2014)
Publisher : Lembaga Penelitian dan Pengabdian Kepada Masyarakat (LPPM), ITS

Show Abstract | Original Source | Check in Google Scholar | Full PDF (832.523 KB)

Abstract

Untuk melakukan evaluasi dan pelaporan Tri Dharma Perguruan Tinggi, ITS telah memiliki Sistem Informasi Terintegrasi Self Assessment Report sehingga bisa menunjang realisasi Rencana Strategis (Restra) yang dijabarkan dalam Tujuan Strategis Bidang Akademik, Bidang Penelitian dan Pengabdian Masyarakat. Sampai saat ini ITS hanya melakukan evaluasi dan pelaporan melalui Sistem Informasi Akademik Terintegrasi pada kegiatan Pendidikan dan Pengajaran saja, yaitu dengan SAR Proses Pembelajaran. ITS juga belum menerapkan alur organisasi yang benar dengan menggunakan siklus Plan-Do-Check-Act (PDCA), yaitu dengan melakukan perencanaan diawal sebelum melaksanakan kegiatan kemudian melakukan kontrol terhadap apa yang dikerjakan dan selalu melakukan perbaikan untuk kedepannya. Oleh karenanya perlu dikembangkan lagi sistem tersebut sehingga bisa melakukan melakukan fungsi evaluasi serta pelaporan yang benar dengan menggunakan siklus PDCA yang bisa mencakup seluruh kegiatan Tri Dharma Perguruan Tinggi di ITS. Rencana penelitian ini adalah melakukan analisis spesifikasi kebutuhan dan desain sistem informasi terintegrasi SAR untuk Tri Dharma Perguruan Tinggi dengan menggunakan metode Prototyping. Pada Prototyping, terdapat 3 tahapan pengerjaan yang dimulai dengan tahapan penggalian kebutuhan, analisis dan desain sistem, dan validasi.

Perancangan Group Technology Layout Di Pt Dps Surabaya Dengan Metode Simulasi Dan Taguchi

Jurnal Teknik Industri Vol 12, No 2 (2011): Agustus
Publisher : Department Industrial Engineering, University of Muhammadiyah Malang

Show Abstract | Original Source | Check in Google Scholar | Full PDF (1628.766 KB)

Abstract

PT Dok dan Perkapalan Surabaya (DPS) is one of several strategic BUMN in marine field. With BUMN restructurisation and efficiency program from Government, PT DPS is liable to improve its production system efficiency. Many problems that faced by PT DPS to improve its production system efficiency are : (1)There is waste work shop such as work in process, waiting time, and flow time at fabrication process in PT DPS, (2) Because waste work shop is still big, shop production process efficiency has not reached maximally yet, (3)Layout and facilities of PT DPS today is already suitable with concept of Product Oriented Work Breakdown Structure (PBWS), but it is limited at simple construction form. At this research, there is ship production process design with Process Lane Construction and Zone Outfitting method or it is known with Group Technology Layout (Manufacturing Cell System) term in order to solve inefficiency problem at ship production process in PT DPS. Design process is performed by integrating Simulation method, Taguchi, Response Surface Methodology, and Analytical Hierarchy Process (AHP). Simulation method is used to model designed manufacturing cell system, meanwhile Taguchi method and Response Surface Methodology are used for experiment and optimization at manufacturing system simulation model. In order to measure the performanceof designed manufacturing cell system, multivariate measurement method is used, that is by measuring work in process, waiting time, and flow time with smaller the better criteria. Multi response becomes single response by using Analytical Hierarchy Process (AHP) method. From research result with Taguchi Method and Response Surface Methodology know that in fabrication stage optimal layout is second tipe, optimal set up time is 40 minutes, optimal lot size is 16 tons, optimal loading interval is 400 minutes, optimal demand stability is 92.5 %, in subassembly stage optimal layout is first tipe, optimal set up time is 40 minutes, optimal lotsize is 10 tons, optimal loading interval is 400 minutes, optimal demand stability is 92.5 %, in assembly stage optimal layout is first tipe, optimal set up time is 40 minutes, optimal lotsize is 6tons, optimal loading interval is 400 minutes, optimal demand stability is 92.5 %, in erection stage optimal layout is second tipe, optimal set up time is 40 minutes, optimal lot size is 6 tons, optimal loading interval is 480 minutes, optimal demand stability is 92.5 %.

Rancang Bangun Sistem Informasi Monitoring Perkembangan Proyek Berbasis Web

Jurnal Teknik Industri Vol 11, No 1 (2010): Februari
Publisher : Department Industrial Engineering, University of Muhammadiyah Malang

Show Abstract | Original Source | Check in Google Scholar | Full PDF (700.872 KB)

Abstract

Bina Marga and Pematusan official (Bimatus) is government office that deals with transportation improvement and maintenance especially streets and bridges. Each of projects in Bina Marga and Pematusan official has work planning data. Those early data are used as a measure for project development. Consequently, project development information is one of the important things to know whether a project is running well. According to that need along with computer based system improvement that is used to maintenance real and planning data, official would know whether project realization is running well or not. System development is begun with needs identification, then, created system design that is explained with UML and ERD. System design is used in web circumstances, WAP-PHP based, and MySql database. Finally, examinations for many functions are done to evaluate system task. This results a web application and WAP that could manage project development data at Bina Marga and Pematusan Official.

Value Engineering dalam Pembangunan Rusunawa

Jurnal Teknik Industri Vol 10, No 2 (2009): Agustus
Publisher : Department Industrial Engineering, University of Muhammadiyah Malang

Show Abstract | Original Source | Check in Google Scholar | Full PDF (1324.15 KB)

Abstract

Value engineering is done to make an effort to organize systematically and applying a technique that identifies the product function that aims to meet the required function with the lowest price. Analytical Hierarchy Process method is used in the analysis phase of work plan to choices alternative that is more objective based on several variables. In the chart of the breakdown cost model, 7 items of work have the highest cost, based on the work items was found 2 items of work that have the potential to do great engineering work that is the value of the walls and ceiling. The application of the results of value engineering on the walls, recommended the bricks, concrete stiffeners, stucco 1:4, paint walls, ceramic that savings of Rp 92,578,941 or 13.6% of the total cost of initial construction. In the same way, for the ceiling work that is recommended to change the calsiboard hollow iron frame with GRC framework furing metal so that savings of Rp40, 499,036 or 17.3% and ceiling aluminum grill on the bathroom with the calsiboard furing metal frame so that savings of Rp20,226,477 or 40%. Total savings that occur: Rp7,036,167,661 — Rp6,882,863,207 = Rp153,304,454 or 1.95% of total construction cost.

Computation of Reliability, Average Reliability, and Maintainability of Service Demand Fulfilment Dynamically using System Dynamics

International Journal of Supply Chain Management Vol 8, No 3 (2019): International Journal of Supply Chain Management (IJSCM)
Publisher : International Journal of Supply Chain Management

Show Abstract | Original Source | Check in Google Scholar

Abstract

An enterprise not only need information about the time-based service performance (reliability and maintenance of services) but also need to know the effect of time variables on service performance and demand dynamically so as to determine the right service time to providing the services level. This article proposes system dynamics approach to simulate the reliability, average reliability and maintainability of services and enterprise based on service time of demand fulfillment. The model created is a dynamic model that forms a closed system containing negative feedbacks that can be used to simulate. Generally, in a dynamic model with negative feedback, the decrease of time variable causes the increase of reliability of service. However, the simulation scenarios of the dynamic model with negative feedbacks in this article show the decrease of time variables (service time of demand fulfillment and its meantime, meantime of reliability function) can cause either decrease, increase or no change to the total of demand as well as number and average of demand reliability, average reliability, and maintainability in the enterprise.