Articles

HUBUNGAN ANTARA BUDAYA ORGANISASI DAN TINGKAT KEPERCAYAAN PADA PERUSAHAAN KONTRAKTOR DI SURABAYA Wibowo, Lukas Hari; Andi, Andi
JURNAL DIMENSI UTAMA TEKNIK SIPIL Vol 1, No 1 (2014)
Publisher : Magister Teknik Sipil Universitas Kristen Petra

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

ABSTRACT: Construction business competition in Surabaya is getting tougher and thus require good performance in a construction organization. Performance of the organization requires trust that each individual, team, or group can act achieve the desired goal. The level of trust in an organization is influenced by the organizational culture. This study aims to determine the organizational culture and the level of confidence in large and medium-sized construction company in Surabaya, as well as the relationship between the level of trust and organizational culture.Based on the research that has been done, large and medium-sized contraction company in Surabaya tend to Clan culture type than other type of culture (Adhocracy, Market, and Hierarchy), which is concerned with loyalty and tradition; with high degree of organization trust in contractor company. Organizational culture is positively correlated with the level of trust, making any type of organizational culture as an important asset for the company to increase trust in the contractor organization, and the Hierarchy culture that can be used as the primary reference organization in increasing trust.
ANALISIS BIAYA ELEMENTAL UNTUK PERENCANAAN BIAYA PROYEK APARTEMEN Kempa, Meidy; Andi, Andi; Arijanto, Lie
JURNAL DIMENSI UTAMA TEKNIK SIPIL Vol 1, No 1 (2014)
Publisher : Magister Teknik Sipil Universitas Kristen Petra

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Apartment’s project cost planning involves a Quantity Surveyor to determine the target cost (budget) for the owner. Target cost must included all elements of the existing building. This study aims to determine the format and price range of each building element in the elemental cost analysis for apartment’s project cost planning.The data were obtained by looking at historical data of the middle class  apartment’s projects Bill of Quantity in area of Surabaya, Solo and Semarang with reference to the format NPWC List of Elements, Australia.The results of the data analysis showed that the format of building elements that can be used in elemental cost analysis consists of 11 major elements are Preliminaries, Sub-structure, Super-structure, Finishes, Fittings, Services, Site Works, External Services, Waterproofing, Grills & Iron, and Pool. While the price range of elements in the elemental cost analysis showed that the apartment’s project which has a basement, the price difference is 20-30% larger than projects that do not have a basement. For the project which has storey height ≥ 3m, the price difference is 3.5-20% larger than projects which has storey height < 3m. For projects which has a basement & storey height ≥ 3m, the price difference is 30% larger than the project which has a basement & storey height <3m. Keyword : cost planning, target cost, apartment’s project, building elements, elemental cost analysis
PERBANDINGAN PPC DAN FAKTOR-FAKTOR YANG MEMPENGARUHI PADA DUA PROYEK APARTEMEN Jonathan, Jonathan; Anton, Anton; Andi, Andi
Jurnal Dimensi Pratama Teknik Sipil Vol 4, No 1 (2015)
Publisher : Jurnal Dimensi Pratama Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Dalam perkembangan dunia konstruksi yang semakin komplek, sering terjadi pekerjaan yang tidak dapat diselesaikan sesuai dengan jadwal perencanaan yang ada pada action plan. Penelitian ini bertujuan untuk menilai suatu perencanaan proyek dengan menghitung Percent Plan Completed dan juga mendapatkan faktor-faktor penyebab tidak tercapainya rencana pekerjaan (Reason Not Complete). Hal ini dilakukan dengan menerapkan kontrol aliran kerja yang berkesinambungan agar perencanaan menjadi lebih handal. Selain itu juga akan diteliti mengenai penggunaan kontrol aliran kerja sistem last planner pada suatu proyek konstruksi. Penelitian ini telah dilakukan selama 19 minggu. Hasil penelitian menunjukkan bahwa rata-rata PPC (Percent Plan Completed) sebesar 61,15% dan 57,32%, kemudian faktor penyebab dominan tidak terselesaikannya pekerjaan dalam proyek ini adalah faktor predecessor. Selain itu proyek yang diamati ini sedikit melakukan kontrol aliran kerja sistem last planner. Dimana aliran kerja yang dilakukan yaitu action plan2 mingguan dan daily meeting yang dilakukan seminggu sekali.
PRODUKTIVITAS ALAT BERAT PADA PEKERJAAN GALIAN GEDUNG P1 P2 UK PETRA Sutanto, Kelvin Rudy; Kosasi, Michael Halmar; Andi, Andi
Jurnal Dimensi Pratama Teknik Sipil Vol 4, No 1 (2015)
Publisher : Jurnal Dimensi Pratama Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Pemilihan alat berat mempengaruhi efisiensi dan profitabilitas pada pekerjaan konstruksi. Tingkat efektivitas alat berat dinilai berdasarkan produktivitas alat. Produktivitas merupakan hasil bagi dari output terhadap input. Metode penelitian yaitu dengan menghitung volume aktual (VA) yang tercapai per hari, mencatat volume bucket, waktu siklus (Cm), waktu kerja dan waktu efektif backhoe menggali setiap hari. Dua pendekatan dilakukan untuk perhitungan produktivitas menggunakan waktu siklus untuk satu kali siklus backhoe dan waktu kerja harian yang dibagi menjadi waktu kerja selama 8 jam serta waktu efektif tanpa idle. Hasil pengolahan data waktu siklus diperoleh produktivitas ideal (PI) menggunakan waktu siklus baseline sebesar 140.05 m3/jam, produktivitas teoritis (PT) menggunakan waktu siklus teoritis sebesar 67.185 m3/jam, produktivitas aktual mean (PA) menggunakan waktu siklus rata-rata sebesar 110.83 m3/jam. Sedangkan hasil pengolahan data dari waktu kerja adalah produktivitas aktual kinerja (PAK) yang dibagi dengan waktu kerja 8 jam sebesar 28.91 m3/jam, produktivitas aktual efektif (Pefektif) dengan waktu efektif tanpa idle sebesar 47.35 m3/jam. Pada akhirnya, dengan menggunakan PAK disimpulkan bahwa produktivitas backhoe pada proyek gedung P1 P2 UK Petra adalah 28.91 m3/jam/alat. Selisih nilai produktivitas tersebut dipengaruhi oleh double handling dan waktu tidak efektif backhoe akibat idle, maintenance, menunggu dump truck, merapikan tanah, dan moving.
MOTIVASI PEKERJA PADA BEBERAPA PROYEK KONSTRUKSI DI SURABAYA Andi, Andi; Djendoko, Dwi
Civil Engineering Dimension Vol 6, No 2 (2004): SEPTEMBER 2004
Publisher : Institute of Research and Community Outreach - Petra Christian University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (132.125 KB) | DOI: 10.9744/ced.6.2.pp. 80-87

Abstract

The role of worker motivation is very important in improving construction productivity. In order to increase the motivation, it is essential for management to understand needs of the workers as well as factors motivating and demotivating. This paper aims to determine the needs level, motivators, and demotivators of construction workers in Surabaya based on Maslow and Herzberg’s theories. For the methodology, the study conducted a questionnaire survey, and 263 workers participated in the survey. It is found out that the workers are still at the physiological needs level. Good salary and safety programs are two most important motivators for workers, whereas two most important demotivators are bad treatment by supervisor and insufficient material availability. The paper discusses the findings and proposes solutions to increase workers motivation. Abstract in Bahasa Indonesia : Motivasi kerja memiliki peranan yang penting dalam peningkatan produktifitas dalam industri konstruksi. Untuk dapat meningkatkan motivasi kerja pekerja perlu diketahui kebutuhan pekerja pada saat ini, serta pemahaman motivator dan demotivator pekerja oleh supervisor. Berdasarkan latar belakang ini, penelitian ini ditujukan untuk menentukan tingkat kebutuhan, motivator dan demotivator pekerja konstruksi. Untuk tujuan tersebut digunakan dua teori motivasi, yaitu teori Maslow dan teori Herzberg, dan dilakukan survei di beberapa proyek konstruksi di Surabaya dengan menggunakan kuesioner. Secara keseluruhan, 263 orang pekerja berpartisipasi dalam penelitian ini. Hasil penelitian menunjukkan bahwa pekerja konstruksi di Surabaya masih berada pada level physiological needs. Upah yang baik dan program keselamatan kerja yang baik menempati posisi tertingi sebagai motivator bagi pekerja. Sedangkan demotivator terpenting bagi pekerja adalah perlakuan yang buruk oleh atasan dan ketersediaan material yang kurang baik. Makalah ini membahas hasil yang didapatkan dan memberikan beberapa usulan untuk meningkatkan motivasi pekerja.
PEMERIKSAAN SEDERHANA LAPANGAN PPh PASAL 25 TERHADAP KEPATUHAN WAJIB PAJAK Andi, Andi
Jurnal Kajian Akuntansi Vol 4, No 1 (2009): Juni 2009
Publisher : UPN "Veteran" Yogyakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

This study aims to determine differences in corporate tax compliance before and after a simple examination of the field and the influence of Simple Field Inspection of Income Tax Article 25 on taxpayer compliance in meeting tax obligations. This research was conducted at the Tax Office Primary Serang Banten. The research object is the ratio of individual income tax return income tax payable under Section 25 Overpayment of tax payers and after examination by tax inspectors from the year 2003-2007. The research used descriptive research methods and verification. The results (1) the verification shows that there is difference in improving taxpayer compliance corporate income tax overpayment of Article 25 which after a simple inspection, (2) descriptive quantitative Results showed a significant difference between the simple inspection the field of taxpayer compliance. Also see the value of a significance level of 0.05, where t sig of 0.000 <0.05 then the partial correlation coefficients tested were significant. From the calculation of correlation coefficient (R) obtained yield was 0.734 or 73.4%, this indicates that the correlation between the simple inspection the field for income tax overpayment of article 25 of the taxpayer compliance agencies in meeting their tax obligations is strong and has a positive relationship. Keywords: Inspection, Income Tax, Taxpayer Compliance.
INSPEKSI FABRIKASI DAN EREKSI PADA KONSTRUKSI BAJA PROYEK GEDUNG P1-P2 UK PETRA SURABAYA Berdikari, Alfio Julianto; Hartanto, Andrean Budhi; Andi, Andi
Jurnal Dimensi Pratama Teknik Sipil Vol 4, No 2 (2015)
Publisher : Jurnal Dimensi Pratama Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Konstruksi baja merupakan hal yang sangat banyak dipakai secara luas sebagai konstruksi bangunan. Inspeksi yaitu memantau hasil proyek tertentu untuk menentukan apakah hasil proyek tersebut memenuhi standar kualitas yang sesuai dan megidentifikasi cara untuk menghilangkan penyebab kinerja yang tidak memuaskan. Tujuan penelitian ini adalah untuk dapat melakukan inspeksi dalam fabrikasi dan ereksi konstruksi baja.Metode penelitian yaitu dimulai dengan pembuatan form checklist dengan referensi dari studi literatur. Pengumpulan data dilaksanakan dengan sistem pengamatan dan pencatatan secara langsung langsung. Pengolahan data dilakukan dengan skala frekuensi dari data yang didapatkan.Hasil penelitian berupa analisa frekuensi setiap faktor inspeksi fabrikasi dan ereksi sebelum perbaikan dan setelah dilakukan perbaikan. Faktor yang paling sering tidak dilakukan dengan baik pada fabrikasi dan ereksi adalah pada proses penyimpanan.
Modeling The Influence of Project Manager Trustworthy Leadership Behavior Upon Construction Team Trust Andi, Andi; Santoso, Herry; Simanjuntak, Jonathan
Civil Engineering Dimension Vol 10, No 2 (2008): SEPTEMBER 2008
Publisher : Institute of Research and Community Outreach - Petra Christian University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (147.016 KB) | DOI: 10.9744/ced.10.2.pp. 109-117

Abstract

Appropriate trust and leadership have been frequently cited as key answer to the problems of cooperation and coordination in contractor’s teamwork. The objectives of this paper are to measure trust level of construction projects team, to investigate trustworthy leadership behavior of project managers, and to model the influence of project managers’ trustworthy leadership behavior upon team trust level. Sixty-one respondents from nine on-going construction projects participated in the questionnaire survey. The analyses show that in general the levels of trust and project managers’ trustworthy leadership behavior are medium (scores of 82.71 and 102.09 respectively). Meanwhile the positive influence of project managers’ trustworthy leadership behavior upon team trust level, modeled through multiple regression analysis with one dependent variable (i.e. trust) and three independent variables (i.e. leadership-results, leadership-integrity, and leadership-concern), is found to be significant. The model is evaluated and validated; the results reveal that the prediction of the model is satisfactory.
Model Persamaan Struktural Pengaruh Budaya Keselamatan Kerja pada Perilaku Pekerja di Proyek Konstruksi Andi, Andi; Alifen, Ratna S; Chandra, Aditya
Jurnal Teknik Sipil Vol 12, No 3 (2005)
Publisher : Institut Teknologi Bandung

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (215.065 KB)

Abstract

Abstrak. Budaya keselamatan kerja memegang peranan sangat penting dalam membentuk perilaku pekerja pada proyek konstruksi. Dengan demikian usaha untuk mengurangi kecelakan kerja di konstruksi harus dimulai dengan membentuk budaya keselamatan kerja yang baik. Namun, studi mengenai budaya keselamatan kerja serta pengaruhnya kepada perilaku pekerja masih sangat jarang di konstruksi. Penelitian ini ditujukan untuk mengetahui secara empiris pengaruh budaya keselamatan kerja pada perilaku pekerja. Untuk mencapai tujuan ini, pertama-tama diusulkan suatu model yang terdiri dari enam faktor budaya keselamatan kerja dan satu faktor perilaku pekerja. Model ini kemudian diuji dengan metode model persamaan struktural (structural equation modeling). Data diperoleh dengan cara menyebarkan kuesioner kepada pekerja. Dua ratus tujuh set kuesioner berhasil dikumpulkan dan digunakan untuk menganalisa model yang diusulkan. Hasil analisis model persamaan struktural menunjukkan hanya empat faktor budaya keselamatan kerja yang memberikan pengaruh secara signifikan pada perilaku pekerja. Makalah ini menyimpulkan bahwa: (i) komitmen pihak manajemen merupakan penggerak utama dari budaya keselamatan kerja, dan (ii) perilaku pekerja dapat dikendalikan melalui kombinasi pendekatan prescriptive dan discretionary.Abstract. Safety culture plays a very important role in shaping workers’ safety behavior in construction project. Therefore efforts to minimize construction accidents should first be started by performing good safety culture. However, existing empirical attempts to study safety culture and its influence to worker behavior in construction are still in their infancy stage. This research examines empirically the influence of organizational safety culture on workers behavior. To accomplish this objective, the research first proposed a hypothetical model, which comprised of six factors of organizational culture and one factor of worker behavior. This model was then evaluated statistically through structural equation model. Data needed were collected by conducting questionnaire survey to construction workers. A total of 207 valid questionnaires were returned and formed the basis for structural equation modeling and subsequent analyses. The analyses results indicate only four safety culture factors having significant influence on workers behavior. The research concludes that top management commitment is a pivotal driver of safety culture, and the workers behavior can be controlled using the combination of prescriptive and discretionary approaches.
KEABSAHAN PERLAWANANPIHAK KETIGA TERHADAP SITA EKSEKUTORIAL DAN AKIBAT HUKUMNYA DI PENGADILAN NEGERI SAMARINDA Andi, Andi
DEDIKASI JURNAL MAHASISWA Vol 3, No 1 (2015)
Publisher : DEDIKASI JURNAL MAHASISWA

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

ABSTRACTIn the resistance against the confiscation good third party was brought against confiscation eksekutorial, nor against confiscation, such third parties fighting, and was originally called the plaintiff and the defendant challenged sequester originally called challenged consumed. Article 195 (6 and 7) HIR set: Resistance to seizure executorial; Submitted by the challenged / consumed; Submitted by third parties on the basis of property rights; Resistance filed with the district court chairman yangmelaksanakan execution; There is an obligation of the chairman of the district court that checks / cut resistance to report on the examination / decision of the case of resistance to the chairman of the district court which ordered eksekusi.Pasal 207 and Article 208 HIR set: How to apply resistance (orally or in writing); To whom / which the chairman of the district court, the resistance must be filed; The existence of the principle, that the opposition does not suspend execution; Exceptions to these principles; The possibility to apply banding.Dari clauses in question seems clear that the opposition filed against the confiscation eksekutorial. It means, that the goods in question, is the confiscation of goods that can be raised against him beg, they are in foreclosure, in other words, that the goods have not been auctioned off or must be delivered (carried surrender to the winning side).Keywords: eksekutorial seizure resistance.
Co-Authors Adelia, Jessica Aditya Chandra, Aditya Alfio Julianto Berdikari, Alfio Julianto Andhika, Albertus Andrean Budhi Hartanto, Andrean Budhi Andri Prasetya Andrianto, Wilson Andrianto, Wilson Anton Anton Anugrah P.G., Stefanus Anwar, Arfianti Novita Bambang Sutrisna Billy Susilo, Billy Bryan, Theodorus Cahyo, Hongki Ciputra, Hendry Darmawan, Resano Djuuna, Irnanda A. F. Dwi Djendoko Effendi, Stevanus William Fadhillah, Muhammad Rizky Fani Fani Febriani, Leny Fendyanto, Calvin Ferdiana Soekresno Hansel, Hansel Hasibuan, Muhammad Siddik Hendra Wijaya Herry Santoso Heru Purwoadi Indri Hendarti Jani Rahardjo Janice Janice Jonathan Jonathan Jonathan Simanjuntak Kelvin Rudy Sutanto Kiswanto Kiswanto koento danny wibowo Laksono Trisnantoro Lie Arijanto Lukas Hari Wibowo Mahmud Mahmud Marcella Erwina Rumawas Marcellino, Hugo Meidy Kempa Michael Halmar Kosasi Michael Michael Monica, Raula Nana Nofianti, Nana Ningrum, Dina Dwi Nyoto Nyoto, Nyoto Oetomo, Kristoforus Hendy Ong, Jayadi Pranajaya, Denny Pranajaya, Denny Princen Princen Purnomo, Evan Agung Rahayu, Kyki Dwi Novianti Ratna S Alifen Rianto, Stefanus Ronald Chandra Tali Ryan, Michael Hans Ryan, Michael Hans Samjaya, Kevin Wisely Samuel Winata Sanjaya, Felix Sanjaya, Felix Saputra, Lorenz Sari, Dara Novita Sariroh, Sihhatus Sidarta, Yosua S. Stanley, Vincentius Steven Wijaya Sudarno Sudarno Sukamto, Ryan Chrismawan Sukamto, Ryan Chrismawan Sukiman, Vincent Suryadharma, Samuel Susandi Susandi Susanti, Nurul Susanti, Nurul Susetio, Antoni Tabita Tania Libianto Tris Haris Ramadhan Valentinus Budi Kidarsa Wahyu Kurniawan Santoso Wijanalto, Alfonso Willson, Willson Winarto, Ronald Winarto, Ronald Yan, Yohanes Yanto Handarlim Yerikho, Bobby Yerikho, Bobby Yohana Margarita Yuliastuti, Nadya